CSR供应商指南 , 术语定义(三)

来源:  发布时间:2016/3/28 19:45:10
PVH的巨大市场,使得相关产品的供应商甚是兴奋,但是想获得PVH的订单并不容易,首先一点就是要PVH验厂。所有员工人事档案(包括劳动合同,人事记录,身份证明复印件等),考勤记录(最近一年),工资表(最近一年),生产日报表(最近一年),工人个人产量记录/工资计算记录(最近一年), 厂规 / 员工手册 ,营业执照 ,消防证,环保证 ,急救培训证书(由正规医疗机构提供),社会保险供款单据,消防演习记录资料(最近一年),工伤记录(最近一年),请假记录(最近一年),纪律处分记录(最近一年),食堂卫生证 ,厨房工作人员健康证,高压锅炉使用证及操作证。

导读

 

 

Collective bargaining Agreement (“CBA”): Set of terms negotiated by workers representatives (e g union)

and management regarding employment conditions a CBA often replaces, or makes unnecessary, individual

employment agreements between the employer and the employee When legally negotiated and registered,

the terms of the CBa become legally binding and are accepted workplace terms and conditions

 

CSR: Corporate social responsibility

 

Decibel (db): a decibel is a measure of sound pressure level (noise) Measurements are most often made in the

a-weighting scale and therefore are abbreviated as dBa

 

Denial of Access: any situation where a PVH associate or representative, independent external

assessor, project partner or consultant is refused entry to the manufacturing site, access to documents or

permission to interview workers.

 

Discretionary income: the amount of a worker’s wages available for spending or saving after basic needs

have been met.

 

Discrimination: any distinction, exclusion or preference based on a personal characteristic which deprives a

person of access to equal opportunity or treatment in any area of employment.

 

Draft Findings: the finalized copy with all of the associated details that will be provided to the factory

after the assessment and sent to PVH CSr within 48 hours of the assessment.

 

Emergency Action Plan: an emergency action plan (or contingency plan) is a building or site specific plan

that takes into account all actions (e g evacuation), by all employees related to fire or other emergencies with

a clear definition of roles and responsibilities to prevent, mitigate and recover from an event such as a workplace

fire or other emergency (e g earthquake, flood, act or terrorism, etc ) an emergency action plan must be in

writing, kept in the workplace, and available to employees for review

 

Employee: all men and women directly employed or contracted by an employer, including executives,

managers, supervisors, production workers and administrative (office) workers all persons hired directly

by the factory or hired indirectly through a third party, to work on the production or to provide support

thereof.

 

Ergonomics: the applied science of equipment design, as for the workplace, intended to maximize productivity by

reducing operator fatigue and discomfort.

 

Evacuation map: Maps posted in buildings used to advise building occupants, be they employees, residents,

or visitors, of the best route(s) to egress the building, or to temporary shelter from their location the

maps are developed from floor diagrams and include arrows that designate the exit route assignments these

maps also show locations of exits, assembly points, and equipment (such as fire extinguishers, first aid

kits, and spill kits) that may be




本文发自创盛验厂网,转载请写明出处,文章编辑:王必升  更多请查看PVH验厂咨询专题

 

分享到:
PVH验厂顾问
ANDY(赵先生)

电话:13631773435


扫一扫 关注我们